Water Treatment Plant #2 Reliability Project

Project Type:
Water
Project Status: 
Underway
Date Received: 
Wednesday, January 1, 2020
Location: 
Winter Springs, FL 32708

Update 01/18/22

The city has received the standby generator.  The contractor ESI has been provided a notice to proceed. Parts and equipment have been procured and ESI will fully mobilize and begin work upon delivery.  They are experiencing the same issues as everyone else with getting the appropriate parts to complete the project.  Like everything from toilet paper to pet food there is a long delay in receiving parts.   

Capital Project Summary

Kimley Horn Engineers and Bailey Engineering have reviewed the facility and designed a standby generator. This will assure more reliable service during the loss of power in a hurricane or other event. The generator has been ordered but takes a long time to be built. It is expected to be delivered and installed in mid-2021.  

Water Works Program

This project is a part of our Water Works Program. This program is an aggressive action plan loaded with a series of projects aimed to improve the City’s water, wastewater, reuse, and stormwater infrastructure and facilities.